The rock slope slid above the switch yard field during construction period on March 10, 1996. According to the research and treatment on this slope sliding, the forming conditions, influence factors and working mechanism of slope sliding are studied.
1996年3月10日,开挖中的开关站边坡发生岩体滑动,影响整体工程。结合滑坡的分析和治理工作,对其产生条件、影响因素及发生发展机理作了较深探讨。
The field of 500 KV switch yard is a pivotal project of the power station and formed by excavating mountain slope.
枢纽项目500KV开关站场地系从陡峭山坡中开挖而成。